Tuesday, 22 September 2009

Last night "Little Nellie" entered the railways workshops for stage one of the locos upgrade, this was the application of gold lining to the fronts and sides of the water tanks and also to the back of the cab.
Other upgrades for the loco will be a GWR style safety valve cover, tank top coal bunker, tool box and name/number/works plates.
Above: Nellie poses in platform 1 at Sprowston to show off her new lining
Above: Nellie poses on platform 1 at Sprowston to show off her new lining
Above: Before lining was applied Nellie can be seen departing Weybourne with the IoM set
Above: Before lining was applied Nellie can be seen awaiting departure from Weybourne
Above: Nellie can be seen departing Weybourne

No comments: